on 05-24-2010 1:30 PM
Hi,
I am working on a rework process.
With CO07 i'm creating order with order type PPRW.
Selected Ref. Operation Set that has control key ZRWK ( Inspection characteristic Selected )
After releasing the order, lot is not generating.
Is there any other procedure to generate lot for rework order?
Please guide me for this problem.
Regards,
Samir
Hi,
1.Create Production Order
2. Confirm the production Order
3. In QA32, do RR, UD & keep qty for rework
4. Do production confirmation and put qty for rework
5. Add rework control key in the screen of change production order and save
6. Lot for rework will be generated in QA32
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
After releasing the order, lot is not generating.
Is there any other procedure to generate lot for rework order?
If order is without material then how lot will be generated ,its not possible
Second thing use control key in inspection plan in such a way that it will automatically create GE then only lot will be created otherwise you have to manually create lot through MB31
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I think you also need to activate inspection type 04 & 05 inmaterial master.
Regards
SANIL
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.