on 05-21-2010 10:20 AM
Hello,
I have created a overhead costing sheet (having base as material cost elements where a %age is defined to be applied on the material cost) and attached it to the valuation variant of easy cost planning in PS module.
Now for a given project when I am checking the easy cost planning, it is showing all individual lines of resources like material etc. along with its qty, price and value but I can not see the effect of the %age specified in overhead costing sheet.
Kindly suggest what is to be done.
Also pl. let me know whether I can see the cost component structure of easy cost planning.
With Thanks and Regards
Ratna
Hello,
Can anybody guide me to get solution in following scenario?
I have created a overhead costing sheet (having base as material cost elements where a %age is defined to be applied on the material cost) and attached it to the valuation variant of easy cost planning in PS module.
Now for a given project when I am checking the easy cost planning, it is showing all individual lines of resources like material etc. along with its qty, price and value but I can not see the effect of the %age specified in overhead costing sheet.
Kindly suggest what is to be done.
Also pl. let me know whether I can see the cost component structure of easy cost planning.
With Thanks and Regards.
Ratna
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
Thanks for your reply.
But when I run CJ46 for a particular WBS element, it says "The object is not relevant for processing".
I have created the costingsheet as per the process mentioned below.
For overhead costing sheet, base is created with raw material cost elements range and origin group range.
Overhead rate is defined with dependency D020 - Overhead Type/Plant as 1.5% with proper validity period.
Credity key is defined with secondary cost element with category 41 and cost center and fixed % with default "*".
The above costing sheet is attached to the valuation variant of easy cost planning in PS module.
There is a cost component structure 10 which is attached to costing variant PS06.
Still CJ46 gives message as "The object is not relevant for processing" when I run it for particular WBS element.
Kindly suggest whether I m missing any other step.
With Thanks and Regards.
Ratna
Hello,
Thanks.
In control tab of WBSE I put the costing sheet . But for overhead key, the drop down is showing only value 'SAP', 'SAP1' and 'SAP2'.
Do I need to use any one of these or I have to create a new overhead key?
In the costing sheet, I had created a "Overhead Rate" with dependency D020 and overhead type 2..
Kindly suggest.
Thanks & Regards
Ratna
Hello,
I put costing sheet in control tab of WBS element and kept Overhead key as blank because in the costing sheet cretated the overhead amount depends on the plant
After this when I run CJ46, it showed 1 overhead calculated -but in detial screen Debit there is no output and the value in table COSP remains same. It does not show the effect of overhead costing sheet maintained for the said WBSE.
Kindly help me.
t
Thanks and Regards
Ratna Palit
Hello,
I put costing sheet in control tab of WBS element and kept Overhead key as blank because in the costing sheet cretated the overhead amount depends on the plant
After this when I run CJ46, it showed 1 overhead calculated -but in detial screen Debit there is no output and the value in table COSP remains same. It does not show the effect of overhead costing sheet maintained for the said WBSE.
Kindly help me.
Thanks and Regards
Ratna Palit
User | Count |
---|---|
103 | |
14 | |
10 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.