consolidate PR in SNP

Former Member
0 Kudos

Hi, experts

Lot size by period week, where I can set let all the replinishment happen on every wednesday?

Thanks.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

In the master data object, Transportation lane, details of Means of transport , there is a field u201CPeriod Factoru2019. The system determines the exact availability date/time of the receipt elements within a period, by adding a time interval (that it gets by multiplying the period factor with the period length) to the start time of the period. You can enter a factor between 0 and 1, where 0 is the start of the period, 0.5 the middle, and 1 the end of the period. When calculating the availability date/time, the system takes into consideration all weekdays, meaning that it does not take into consideration any days that have been defined as non-workdays in the calendars.

The following applications can take the period factor into account:

u2022 Heuristic in Supply Network Planning (SNP)

The SNP optimizer does not consider any period factor.

u2022 Period lot-sizing procedure in Production Planning and Detailed Scheduling (PP/DS)

The following period factors are relevant for the SNP heuristic:

u2022 Period factor in the location product master

In order that the SNP heuristic can take the period factor into consideration, you have to set the Use Period Factor indicator. If you do not set the indicator, the system always uses the standard value 0.5 for the period factor.

u2022 Period factor in the production process model or in the transportation lane

If you have defined a value for the Period Factor for the SNP heuristic in a production process model (PPM) or in a transportation

Please check.

Regards

Datta

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

In APO location product master, under lot size tab, under

procedure, you can set your lot size procedure as

periodic, and period type as week, ie W, set the number

of periods ie which defines the number of periods that are

to be grouped together when forming lot sizes. Maintain

the planning calender as per your requirement to meet

wednesday as replenishment time

Regards

R. Senthil Mareeswaran.

Former Member
0 Kudos

Quanyin,

If you are using PPDS you can definitely make use of the "Planning Calenda" field in LOT SIZE tab of the oproduct master. This can however not be used in SNP.

For SNP try playing around with the 'Shipping Calendar' (SD calendar) maintained for the location and see if it helps.

Abhi