copy control settings Error

Former Member
0 Kudos

Hi All,

1. A copy control has been maintained for ZLZ to ZLZ (Scheduling agreement)

2. An attempt was made to create a scheduling agreement (ZLZ) w.r.t the existing one (ZLZ)

3. After copying the data, the schedule lines are not getting copied.

Note ; Copy schedule lines option is checked in settings. Necessary schedule line settings have also been maintained.

Can anyone share your experience on this?

Regards,

Jagan

Accepted Solutions (0)

Answers (1)

Answers (1)

jpfriends079
Active Contributor
0 Kudos

In copying control for sales to sales (VTAA)

in Schdline Cat, for the desiresd Schdline Cat entry, SchdLneCatProposal if it is maintained same as Sched.Line Cat.

Then, maintain Field / Entry as BLANK for SchdLneCatProposal.

And check.

Copying requirements 501 Scheduled qty > 0

DataT 201 Gen.sched.line data

Thanks & Regards

JP

Former Member
0 Kudos

Hi,

In VTAA maintain the schedule line category with following details.

SchdLneCatProposa- CD

Sched.Line Cat.-CD

Copying requirements-501

DataT- 201.

REgards,

KRishna O

Former Member
0 Kudos

Thanks JP.

Actually, I am trying to copy the FORCAST and JIT delivery schdules from one scheduling agreement to other. I do not want the system to propose a new schedule lines. Anyhow, I tried it.It's not working.

Regards,

Jagan

jpfriends079
Active Contributor
0 Kudos

Now check the copying control at I Cat level.

Whether Copy schedule lines is Selected.

DataT 151 General item data

DataT 102 Bus.data/item compl.

DataT 002 Partner item

FPLA 251 Conditions

Copying requirements 301

Note:again ItemCat Proposal should be blank.

With this hope your problem may be solved.