on 05-20-2010 9:40 AM
Hi All,
1. A copy control has been maintained for ZLZ to ZLZ (Scheduling agreement)
2. An attempt was made to create a scheduling agreement (ZLZ) w.r.t the existing one (ZLZ)
3. After copying the data, the schedule lines are not getting copied.
Note ; Copy schedule lines option is checked in settings. Necessary schedule line settings have also been maintained.
Can anyone share your experience on this?
Regards,
Jagan
In copying control for sales to sales (VTAA)
in Schdline Cat, for the desiresd Schdline Cat entry, SchdLneCatProposal if it is maintained same as Sched.Line Cat.
Then, maintain Field / Entry as BLANK for SchdLneCatProposal.
And check.
Copying requirements 501 Scheduled qty > 0
DataT 201 Gen.sched.line data
Thanks & Regards
JP
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Now check the copying control at I Cat level.
Whether Copy schedule lines is Selected.
DataT 151 General item data
DataT 102 Bus.data/item compl.
DataT 002 Partner item
FPLA 251 Conditions
Copying requirements 301
Note:again ItemCat Proposal should be blank.
With this hope your problem may be solved.
Thanks & Regards
JP
User | Count |
---|---|
94 | |
11 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.