Hi Gurus,
Yesterday I insert a new row at OB08 tx. at backend system (R/3) for exchange rate of May 17,2010, the value was 10.00. Then I run the BBP_GET_EXRATE program to replicate the info to SRM.
But when I created a purchase order (PO) the value was 12.24 for exchange rate (this value 12.24 is the value for the previous day May 16, 2010).
Today morning (May 18, 2010), I inserted another row at R/3 and replicated to SRM, the new value for May 18 was 11. I create another PO and the value was 10 for exchange rate (the value for yesterday).
But when the PO is transmitted to R/3, the exchange rate is the correct.
My question is: Why exchange rate is not displayed correctly when I create the PO in SRM? Exists an aspect of memory in SRM that it has to be refreshed? Why SRM is getting the exchange rate for yesterday? Is an issue for time zone?
Hi
Check TCURR t table itme stamp
Are SRM time zone and ECC time zone difference in time stamp ?
check it up.
Muthu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Muthu,
I don't know how to check TCURR table time stamp, the fields are:
MANDT Client
KURST Exchange rate type
FCURR From currency
TCURR To-currency
GDATU Date As of Which the Exchange Rate Is Effective
UKURS Exchange Rate
FFACT Ratio for the "from" currency units
TFACT Ratio for the "to" currency units
I checked the time zone with Basis, and it's the same in both systems (SRM and R/3).
I have SRM 4.0 (SRM_SERVER 500) and R/3 4.7 (SAP_APPL 470).
Edited by: Juan Alonso Valenzuela Rodríguez on May 19, 2010 4:02 PM
Hi Muthu,
Yes, I'm inserting the new exchange rate in R/3 and then synchronizing to SRM with BBP_GET_EXRATE program.
But if I am creating the PO in SRM, the exchange rate is yesterday's.
I don't know if at midnight is executed some job or updated memory and this way the exchange rate is updated to be used in creating PO in SRM only next day.
Hi Muthu,
I'm in Extended classic.
I already discovered what is happening. At the time of being creating the purchase order (PO), it takes the exchange rate of the delivery date of the shopping cart (SC). But when the order is authorized and tries to transmit it to R/3, it takes the exchange rate of the date of creation of the PO.
Two checks of budget exist:
1.- When creating PO (exchange rate date of delivery date of the SC's item)
2.- When authorized and tries to transmit it to R/3 (exchange rate date of creation date of the PO)
If exchange rate of delivery date of the SC is lower than exchange rate date of creation of the PO, there are cases in which it is marking budget error.
Now my question is: It is a standard behavior? (to take different exchange rate)