on 05-18-2010 3:31 PM
Hi All,
MTO scenario is a standard PP process which depends on the following three things:
1. Strategy Group
2. MRP groups
3. Item category and MRP type
Now Item category and MRP type combination also determines Schedule line category in SD. I want to know if there is any specific settings required in schedule line category or at some other place in SD to enable MTO scenario.
Thanks in advance for your help.
Ravi
Hi,
Its a complex scenario.. but see below:
1:Use strategy group 20
2: MRP type PD
3:Av chk 02
4:Item Categ grp 0001
5:Item Categ TAK
6: Schd Line Categ CP (this is standard Schd line category)
7;Req Class 040
steps
Sales Order-MRP run-Planned Order-Production Order
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Please follow the below link . It will help you to configure the MTO scenario.
http://help.sap.com/saphelp_ides/helpdata/en/51/582a6ea44c11d189bf0000e829fbbd/content.htm
REgards,
Krishna O
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Ravi
The entire set up is included in the block u2018Transfer of Requirements' : Menu path: SPRO/IMG/Sales and Distribution/Basic Functions/Availability Check and Transfer of Requirements/Transfer of Requirements.
You have described the settings correctly. The only additional control is whether you transfer requirements or not for a given SL category. Though Requirement class controls how Transfer of Reqs works, you have an additional handle in SL category definition. Anyway, this setting also figures in the above block.
Hope this helps.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Chandra,
Thanks for your reply.
Apart from TOR, is there any other setting which is responsible for enabling the complete end to end MTO scenario like
1. In Item Category, "Special stock" should be maintained as "E".
2. In MM03 - MRP4 view, Indivual/ Collective req should be maintained.
Similarly, are there any other settings in SD or PP side.
Regards,
Ravi Gupta
User | Count |
---|---|
100 | |
11 | |
11 | |
6 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.