Dear Experts,

I had created a sale order with 3 line items.

Line item 1 Material xxxx qty 10 delivery date as 18th may ship to party a

Line item 2 Material xxxx qty 20 delivery date as 19h may ship to party b

Line item 3 Material xxxx qty 30 delivery date as 20th may ship to party c

In Customer master i had assigned all the ship to party.

When i create the sale order for the first line item a pop up is coming to select the required ship to party.

When i try this for the second or third line item , no pop is coming for me to select the required ship to party.

I had done the ship to party changes in the item level patner data for line item 2 and 3.

Questions:

Even though while creating delivery for the 2 and 3 line item system is taking the line item 1 ship to party why?

In delivery also system is taking the line item 1 date ( ie) 18th May.? why change of delivery date in sale order does not have an impact in deliver

Kindly advice me on this.

Sruthi.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

hi,

If you maintain two different ship to party for 2 line items the delivery will get split.

Check the copy control setting for sales to delivery ( VTLA).

Also check in 0vlk in your delivery tpes if you have ticked - delivery split add prt in the document content.

Regards,

Krishna O

Answers (2)

Answers (2)

Former Member
0 Kudos

Hello,

Please check the Delivery document type configuration settings whether the delivery split is allowed if the additional partners in preceding document (Sales order).

Please activate the check box Delivery Split Part. and try.

PLease let me know if you still face this issue after this.

Thanks,

Ram.

jpfriends079
Active Contributor
0 Kudos

Try and maintain ship to party b & ship to party c along with ship to party a at Sales Doc header level in Partner Tab and correspondingly desired ship to party at each Item level.

For instance,

HEADER

SP-sold to party a

SH-ship to party a

SH-ship to party b

SH-ship to party c

BP-sold to party a

PY-sold to party a

ITEM 1

SP-sold to party a

SH-ship to party a

BP-sold to party a

PY-sold to party a

ITEM 2

SP-sold to party a

SH-ship to party b

BP-sold to party a

PY-sold to party a

ITEM 3

SP-sold to party a

SH-ship to party c

BP-sold to party a

PY-sold to party a

Thanks & Regards

J Prakash

Former Member
0 Kudos

Hello Praakash,

At header level as per standard it will allow one ship to party only.

Regards

Sruthi

Former Member
0 Kudos

Hi shruti,

Goto VA02. Goto each of the 3 line items Partner tab & there put the ship to Party a for line item 10, ship to party b for line item 20 & so-on.

regards

jpfriends079
Active Contributor
0 Kudos

Hello,

Glad to receive a feedback from you on my suggestion posting.

Yes, as per standard partner determination - TA it is not possible to have multiple ship-to party in header. And the delv will take place based on ship to party at Item level.

But, if maintain Z - partner determination for Sales doc header (std is TA).

In the procedure, maintain origin table in source in accordance to you requirement for Ship to Party partner function.

If it works do let me know.

Thanks & Regards

JP