cancel
Showing results for 
Search instead for 
Did you mean: 

BOM explosion in sales order for configurable materials and variants

Former Member
0 Kudos

Hi,

I have these materials:

A: configurable material (header)

B: variant material (header)

C: configurable material 1 (position)

😧 configurable material 2 (position)

E:variant material 1 (position)

F:variant material 2 (position)

I can in the sales order explode in this way the BOM (using SD01 application in the position type of the header material):

1) A --> C+D

2) B --> E+F

while I can't make the explosion in this way: A --> EF and A --> CE

is this possibile? I want to make an explosion of a BOM for a configurable material and having variants material as sons, or having mix sons (one configurable and one variant)

Thank you

Sandra

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Krishna,

could you explain me better what kind of dependency I have to mantain in the BOM please?

I could not maintain all possibile variants for each configurable subitem...

Many thanks for your support!!!!

Sandra

Former Member
0 Kudos

Hi Sandara,

Just check the BOM in cs03 u have maintained !!! If u have maintain the variant material there in the config mat BOM with object dependencies than u can explode !!!!

Please let me knwo if u any query and also if u elabore more than will help u out