05-13-2010 10:09 AM
Hai gurus
Could u provide the scenarios with example the period control works in rate steps
Period Control 01 - month based using key date
period control 02 - month based with intervals
period control 00- to the day
Also to be note
if we use period control 02 ,Is it possible to include Dynamic period control variant in the rate steps .
Kindly suggest Ur comments on the same.
sam satheesh
08-09-2010 1:36 PM
Hi,
The period control in the rate steps is used for the billing of the time depended fees.
00 - To the day
You have billing period from 15.01.2010 till 31.03.2010
- the whole billing period is billed to the date - 31 days
01 - Month based using key date (TE422-STICHTAG)
Is used for monthly analyses of a period.
A period contains a certain number of months. In the process, the key date determines whether a month is included in the respective period or not.
Example
The key date is the 15th of the month. As a result, in a monthly analysis, the period
January 3 - December 22 covers 12 months
January 16 - December 14 only covers 10 months
Vlado