on 05-12-2010 7:25 AM
Hi,
I have created ( ZDBT )Debit basis sale order, at the time of outbond for a particular material (spare) it showing error "Create delivery" not allowed (Sys. status Cost, object VB1001002603000220).
Please help for resolving it.
Thanks,
Anand
Hi,
Could you also post the SAP number of the message?
regards,
w.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Diagnosis
The system attempted to generate the cost component split for the material, but discovered that no assignment has been made in cost component structure Z1 for cost element 40201001 and possibly for origin group .
System Response
The cost component split is incomplete. The cost of goods manufactured in the cost component split is therefore less than in the itemization.
Procedure
Go into Customizing for Product Cost Controlling and carry out the assignment for cost component structure Z1 and chart of accounts 7501.
Hi,
"Diagnosis
The system attempted to generate the cost component split for the material, but discovered that no assignment has been made in cost component structure Z1 for cost element 40201001 and possibly for origin group .
System Response
The cost component split is incomplete. The cost of goods manufactured in the cost component split is therefore less than in the itemization.
Procedure
Go into Customizing for Product Cost Controlling and carry out the assignment for cost component structure Z1 and chart of accounts 7501"
The above seems like a missing config in CO. Have u assigned any WBS or Internal order in the account assignment tab in sales order?
If yes then Show the msg to ur FICO consultant toremove the error.
regards
User | Count |
---|---|
100 | |
11 | |
11 | |
6 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.