cancel
Showing results for 
Search instead for 
Did you mean: 

Sample Management

Former Member
0 Kudos

Hi,

I have to create a number of physical samples based on quantity entered. The materials are managed in PZ (UM). In particular, the rule is:

2-50 pz -> 2 fisical sample

51-500 pz -> 3 fisical sample

501 - 35000 -> 5 fisical sample

> 35000 - 8 fisical sample

Each sample must have the sample size 1 PZ.

Example:

GR = 40 pz --> I have to create 2 samples:

200000375 - sample size 1pz

200000376 - sample size 1 pz

GR= 65pz --> I have to create 3 samples:

200000377 - sample size 1 pz

200000378 - sample size 1pz

200000379 - sample size 1 pz

I tried using sempling scheme but I can only set sample size and not the number of samples. As with Sample-drawing procedures I can't define a correct formula for this case.

You can help me to solve this problem?

Thanks!

G

Accepted Solutions (0)

Answers (5)

Answers (5)

Former Member
0 Kudos

Yes,

I confirm that the

Size factor = 1

Fixed number = 0

G.

Former Member
0 Kudos

Hi,

I created the following Sample scheme : code: TXT

Valuation parameters: without valuationPars

Sampling tables for: Insp. severities

Inspection severity 004

sampling Plans:

Lot size | Sample Size

50 2

500 3

3500 5

99999999 8

Then I assigned this Sample scheme TXT to Sample-Drawing procedure:

Tab primary sample:

Acc to sampling scheme TXT

inspection severity: 004

If I make an goods Receipt of 50 pieces, The system successfully created 2 samples, each 1 piece.

But if I receipt 60 pieces, the system creates 2 samples as the previous case ( the number correct is 3 sample). The same with 200 pieces.

This solution does not solve my problem.

G.

Former Member
0 Kudos

Hi,

I think procedure that you have done is correct if you face still problem then just check in sampling drawing procedure

Tab promary sample--

Size factor 1

Fixed number 0

Jsut check above & revert me back.

Regards

SANIL

Former Member
0 Kudos

Now I understand why companies don't want to install SAP

Thanks anyway for the support.

Former Member
0 Kudos

I tried to use the Sample-drawing procedures, but there is no formula to handle this.

the sequence (that write down) is not linear:

2-50 pz -> 2 physical sample

51-500 pz -> 3 physical sample

501 - 35000 -> 5 physical sample

and > 35000 --> 8 physical sample

How do I achieve this?

G.

Former Member
0 Kudos

Hi,

Have you check sampling schem in this case .

If you use sampling scheme then you can achive this.

you can define sampling scheme

0 to 50 PZs- 2 Physical samples

51 To 500 PZS - 3 physical samples

501 to 35000 Pzs 5 physical samples

35000 above -- 8 physicak samples.

So above you can define sampling shceme .Put this sampling sheme in sampling drawing procedure.

Use this sampling procedure in inspection plan.

I think it will work for you.

Regards

SANIL

Former Member
0 Kudos

Explore sample drawing procedure