on 05-05-2010 4:31 PM
Folks,
We have new installed new PI 7.1 system and importing interfaces from the OLD XI 3.0 system in to new PID 7.1 system.
We are getting following error when we try to import an interfaces in to new PID system:
Import failed because of business system transfer object
Communication component XID_FileSystem: Obligatory
transport target for business system XID_FileSystem not found in
System Landscape Directory
We are yet to install PIQ system.
All the interfaces in the old XID system have transport target of XIQ system. I removed the transport taget for the interface, but transport target is still showing in the Business system under transport target head.
How can we overcome this issue as we will not have PIQ system atleast for two weeks.
Thanks in advance,
Regards
Chandu
Once you create a Business System for Ex: for Dev Environment, u need to create Business System for next hierarchical level of your System landscape, Ex:QA Business System. Then once this is done in the SLD, you can assignt Dev Business System to QA and to next higher levels of systems like Regression, Pre-Prod, PRod...
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You are doing a transport from one system to another.
a transport path must be set in the SLD to accomodate this otherwise it fails - irrespective of your PIQ system.
you must have a transport path set from source to target system available in the target system to do the transport of the ID objects.
Hi,
You need to maintain Transport Groups and target for business systems while SLD transports between your XI system and PI 7.1
Illustrated with DEv & PRD here.
Procedure:
1) Call Integration Builder screen on DEV Server with http://hostname:J2ee Port/rep
2) Call SLD (System Landscape Directory) Component from the Integration builder
Save all the Following .zip files on the Local Desktop
3) Select the Software Component & say Export that you want to Export from DEV
Server to Production server and which is going to use in the IR of XI
4) Also Select the Product of the above SWC and say Export
5) Select the Technical Systems (TS of XI & TS of the SAP R/3) and say Export
6) Select the Business System(s) & say Export; those are associated with above Exported
Technical systems.
In Production Server
1) Logon to the SLD of the Production Server.
2) Create a Technical System and Business system which points to the Production SAP R/3
3) Go to Administration TAB in the main page of SLD
4) Select the Import option to Import the SWC , PRD, TS,& BS which we Exported Earlier in DEV Server
5) Click on Browse and select the .zip files that is to Import into Production Server,
Which were stored on the local desktop at the time of DEV Server Export
And say Import Selected File Option
By this we exported and imported the SLD Objects
Now we have to create transport groups and transport targets in the Production server of SLD
Creation of Transport Groups
Edit GroupsGroup1) Select the Business systems
2) Click on New Group and give the name of the group as DEV_group & select the
Corresponding Development serveru2019s integration Server
3) Similar way create another group for Production serveru2019s business system as
PRD_group and select the Production serveru2019s integration Server
Creation of transport targets
This is to Define which business systems in two different groups correspond to each other
1) Select each Business system in the SLD and select transport TAB---click on
Add/Change Target and select its corresponding target business system.
For Example:
If you select the business system of Production XI server means
In the target you have to select group as DEVGROUP and the business system of Development XI server.
Like this do the same for other business systems also
Ex:
BS_PRD_Integration Server----
BS_DEV_Inetration Server
How to create Transport Groups & transport Targets
http://help.sap.com/saphelp_nw04/helpdata/en/ef/a21e3e0987760be10000000a114084/content.htm
Regards
Seshagiri
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
transports need a target system in the SLD.
i had this problem and just created all the objects.. but i only had 15 scenarios to create
otherwise you will have to create a DEVD business system....
and set target from DEV to DEVD.
any transport for any system needs a source and target systen in the linked SLD.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
84 | |
24 | |
11 | |
9 | |
7 | |
6 | |
5 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.