on 05-04-2010 6:45 PM
Hi, scenario is as follows: received 10 qty of certain roh material from vendor. 8 has been accepted 2 kept in blocked stock. now vendor came to our company and he reworked those 2 blocked / rejected qty and checked by our quality dept and found ok and kept in unrestricted stock. pls advise how to map the above. how to move the 2 rej qty from blocked to quality stock, how system generates insp lot and how to process this. thanks a lot for your support.
Hi,
Just avtivate inspection type for your material ,
MB1B transfer stock posting with movement 349 .Once you do that new lot will get generated with inspection origin 08 .Now for this new lot you can give result recore & usage decision & again post it to as per your requirement.
regards
SANIL
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Activate 08 inspection type.
Do transfer posting with mov type - 349. System will create lot. Do RR & UD to unrestricted.
Hope this helps.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
9 | |
5 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.