I am doing in proces inspection configuration for the first time. I need few helps regarding that:
1) For ins. type 04, do I only need to activate that type in QM view of material master and lot will be generated automatically? or i need to set something else as well?
2) for inspection type 03, thats quality check in routing/master recipe, what are the required configuration?
Please help me with the steps i have to follow.
thank you in advenace
Hi,
If u want to generate lot at the time of GRN then you need to activate 04 inspection type.,
With QP01 create inspection plan ,before that you need to create MIC T Code Qs21
Then after doing GRN system will generate inspection lot for which you can give result record & UD ,Stock posting .
After GRN stock will move to quality then after UD you can do stock posting can move stock to unrestricted use.
For in process inspection in routing you need to activate 03 inspection type.
Once you released production order inprocess lot will get generated.
In routing keep control key PP02 & if recipe then ctrl key PI02,
In routing assign MIC .
Inprocees lot is not stock relavent.
Still any information please revert me back.
regards
SANIL
Edited by: Sanil Vadke on May 4, 2010 7:30 AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sanil,
I followd the steps. Inspection lot is getting generated, but its not showing the MICs. Messege "no characteristics found."
I have included MIC both in routing and insp. plan, but still its not being shown up. MIC are in released status. Usage of task lists is "1", status is 4
plz help