cancel
Showing results for 
Search instead for 
Did you mean: 

Immediate TO creation and confirmation during MB1B

Former Member
0 Kudos

Hi

In one of our client scenario , we need to create a immediate TO creation and confirmation with respect to PCN created during stock transfer from one storage location to another storage location with in a same plant .

I have done the neccesay setting in Tcode OMLR , but the system is not been able to create the immidiate TO perhaps system doesn't know from which storage type it sohuld select the material.

Can anybody hleps me how to configure this . Do i need to customise storage location control .if yes then what are steps in details ?

Thanks

RAJK

Edited by: RAJ K on May 3, 2010 10:37 PM

Accepted Solutions (0)

Answers (1)

Answers (1)

swagat_mohanty2
Active Participant
0 Kudos

Please refer the following thread: -

Thanks

Swagat