Hi,
At the creation of delivery challan during batch determination the system displays the message 'The material is not handled in batch'. Although we have despatched this material considering batch determination previously with all customisation.
Kindly revert back as soon as possible.
Regards,
Goraksh.
Hi Goraksh,
I think somebody removed the check box of "Batch" from material master.
Please check and revert.
Regards,
MT
Edited by: M T on Apr 29, 2010 4:28 PM