on 04-27-2010 1:56 AM
Hi experts.
While I am doing SAP R3 upgrading now, from 470 to 6.0, but seems the upgrade program got stuck on the phase of TAB_IMP in downtime. It takes more than 15 hrs without and logs writed or and CPU occupied... The latest changed log was oracle's alert log which 10 hrs before..
I have no idea how to deal with this cause there were no error... no warning....
My OS system was NT 2003 with 32bit. It was 4 CPUs with 8G memory.. the oracle is 10.2.0.2, is this may caused by the version of oracle?
Anyone who can gives me some suggestions will be much more than thanks!
Hi,
My OS system was NT 2003 with 32bit.
it is due to 32bit Os and you are going for upgrade to ECC 6.0 with EHP4.
There is some pool table updation which take lots of tme due to 32bit operating system.,
Its better to upgrade you OS from 32bit to 64bit and Oracle 32 bit to 64 bit before SAP upgradation.
Thanks
Anil
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
For version of SAP 6.0 you are upgrading the system .
For e.g ECC 6.0 SR3 or ECC 6.0 EHP4
Thanks
Anil
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
86 | |
10 | |
9 | |
9 | |
9 | |
6 | |
6 | |
5 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.