on 04-24-2010 2:13 PM
Hi Gurus,
In my inspection plan I have 2 operations, and sample drawing procedure with 2 pooled samples.
How can I adjust the plan and procedure in order to get ONLY one operation in each sample, i.e: in trx QE51N I want to see my 2 physical sample, where, in the 1st sample there is ONLY operation 0010 and in the 2nd physical sample there is ONLY operation 0020.
Regards,
MaX
removed
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Can you not you use the fixed sample primary sample with sample size =1.for each operation( or say only pooled fixed sample with sample size =1)?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.