on 04-24-2010 7:30 AM
Hi experts,
My Client want Repeatability Reproducibility in SAP. The scenario is evaluate the performance of the inspectors,
Process setups:
1. already inspected material are given to inspector with mask-code,
2. record the results for the material
3. inspector wise evaluate the results.
for this process how can i map this scenario in SAP QM
Please help me,
Regards,
Sbabu
I think this Repeatability and reporducibility used for Validation for material or equipment if it is material or equipment I think that validation should be check precision and linearity and Lod and Loq and repeatability and reproducibility in sap those are called characteristics u should define as a characteristics in quality plan in operation You should maintain short text as Test validation
If u want analyst wise data just assign inspection plan header inspection point u should configure as a inspection point as a operator or analyst if u want lab location that also configure in inspection point because repetability means same test repeat in different analysts reproducibility means same tast in different labs
if any doubt revert me back
Edited by: Lakshmiananda prasad on Apr 26, 2010 10:32 AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Prasad,
I am Maintaining quantitative & qualitative characteristic for Repeatability & Reproducibility. i have created a Inspection plan with inspection points(inspector name, equipment, trail). created manual inspection lot and records the results.
i was little bit confused that how the exact results flow in the repot.
please guide me.
Regards,
SBabu.
1.Create a inspection type as "Gage R&R" for inspection lot origin.
2.Create a task list as a genaral with inspection points in it.
3.in this task list there will be 9 char for which RR to be done.
4.do not specify upper & lower limit as its general task list.
when you want to create a R&R study ,create a manual inspection lot with inspection type.
as you have used inspection points ,do three times Result recording with inspector 1,2,&3 with 9 readings each.
Create a customized Z program which will read all the readings with input as upper & lower limits.set the background calculation in Z program.& disply output.
Sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Please mention the Inspection Lot Origin for the Inspection Type. Whether we need to create the Equipment or Material Code. If we need to create the material code, which material type can be used. If we need to create the Equipment, Is it possible to create the manual Inspection Lot for the Equipment?
Please help me
Thanks & Regards
Senthilkumar
User | Count |
---|---|
96 | |
10 | |
9 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.