on 04-21-2010 3:22 AM
Hi, everyone , I meet a SM59 ABAP conn. Error, when I want create ABAP conn. to ERP 6.0 SR3 . Please give me some advice, thanks a lot.
Questioin Describes:
Here are two servers:
Server A : include SRM server 7.0 and ERP 6.0 SR3
Server B: ERP 6.0 SR3
Now, ERP to ERP ABAP conn. Pass
ERP to SRM ABAP conn. PAss
SRM to ERP ABAP conn. , Error
Error Msg is below:
Connection Error
Error when opening an RFC connection
ERROR: time out during allocate
LOCATION: SAP-Gatewary on host gexiaodu/sapgw00
DETAIL: No connect of TP sapdb00 from host 109.52.70.21 after 20 sec
COMPONET: SAP-Gateway
COUNTER:23
MODULE: gwr3cpic.c
LINE: 1973
RETURN CODE 242
SUBRC:0
RELEASE :701
TIME:Wed Apr 21 08:23:21 2010
VERSION:2
PS: i didn't assign any Gateway.
Please give me some advice, Thanks
Best regards
claud
Edited by: Guang Li on Apr 21, 2010 6:02 AM
Hi,
This is more basis RFC issue, See notes :
581509 Reasons for "timeout during allocate"
566566 Tmeout during allocate, syslog R49 CPICRC 027 SAPRC 456
The problem could also be that setting up the connection takes longer
than the time specified in the timeout parameter. Try increase the
gw/cpic_timeout value and then see if the error persists.
Regards
Lauren
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.