on 06-21-2006 11:35 AM
Hi,
I need to know how to connect "branch" to the workflow, in order to run two validations at the same time. This is the warning showed when I use the "connector" icon in the "branch" step: "Number of connectors to this step exceeds the limit" and I´ve only used one.
I´ll be really pleased if you answer my question.
Thank you.
Message was edited by: José Luis Quintas
Hi Jose
kindly follow the steps mentioned below while performing Workflow BRANCH step.
<b>For example</b> : you have to connect Process1 & Process2 to the BRANCH Step.
1. In the design(visio) once you drag the BRANCH icon complete the attributes like Name, Description & VALIDATIONS( choose anyone available) --> It creates further two lines one for VALID & other for Default.
2.Now Connect Process1 & Process 2 to the BRANCH step.
3.Again in the BRANCH attributes click on the New Valid line & the Default line and choose either Process1 or Process2 respectively.
Hope this might solve the issue.
Please feel free to revert to me for further clarifications.
Thanks
Alexander
P.S: Kindly reward the points, if found problem solved.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Alexander,
Thanks for your help but I need to include two validations in the same "branch" connector. Can I do that? How can I do it?. I follow this steps:
1. I fill validations´ field with the two validations I need to use.
2. Then appear two new fields with the validations´ names.
Now, should I use three "process" connectors (one per each validation and another one for the default field)?
Thanks again.
User | Count |
---|---|
84 | |
10 | |
10 | |
10 | |
7 | |
6 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.