System does not accept Cost Element on External Activity

Former Member
0 Kudos

Hi Experts,

I have maintained the cost element in network profile under the activity type. When I create external activity in project builder system populates the default cost element entered in network profile BUT when I maintain Material Group in activity detailed data, system removes cost element and issues a message "Enter cost element".

System does not accept any cost element in the field. Please guide if there is some setting that I have missed

Thanking in advance

Warm Regards

Accepted Solutions (0)

Answers (2)

Answers (2)

virendra_pal
Active Contributor
0 Kudos

Via txn OBYC also check if the VBR entry with a blank valuation class is missing

If so get your FI/MM consultant to advise the entry details with relevant cost elements

former_member203108
Active Contributor
0 Kudos

check this note Note 759661 - CN22->Cost element field is getting emptied for ext.activity