Hi,
I would like to know whether it is possible to assign measring point to maintenance plans.
Here it goes the scenario
Equipment= PUMP
I have maintenance plan weekly & monthly
In weekly maintenance plan ( Every Monday)I have to check
1.Vibration,
2. Speed,
etc upto 10 measuring point
In Monthly maintenance plan (30 days) I have to check
1.Bearing Condition,
2.Oil Level,
3. Pressure
4.Temperature
5. Current,
6. Voltage
The above mentioned measuring point is created w.r.t equpt PUMP by T-Code IK01.
Now problem is whenever I get call object i.e maintenance order according to weekly & monthly maintenance plan.
Weekly order- 100001 is generated while confirming (IW41) this Order & its operation activity
I will update measuring point but it is displaying all the measuring point of an equipment.
I want only measuring point pertaining to weekly maintenance plan should only display.
How can I link measuring point to particular maintenance plan?
Is there any solution available or does anyone come across this scenario?
Pls revert back for any more information.
Regards
Pradeep
Simple.
Go to node --> Set Screen Templates for Completion Confirmation in 'Completion Confirmations'
Hope your issue is resolved now.
thks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Follow following steps
1. Carry out confirmation from Iw42 and enter order and operation no.
2. In Iw42 select suitable profile from extras--> settings
3. click button measurement/counter readings
4. in pop up window click button meas.points Inspn planning
5. this displays mesuring points assigned to that operation only.
check and revert
thks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Pradeep,
Check whether equipment is entered against order operation.
revert
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI
I have assigned mesuring point in eqpt task list for a particular operation as you told.
3 MP to 1 opeartion & 2 MP to 2 opeartion
I have generated order for maintenance plan.
When I am doing confirmation by using IW41 if I click on measuring point button & later measuring point on object it displays all the measuring points 5 MP.
It is not displaying according to operation wise.
Measuring Point Object exists fucntional location, equipment, rental building &rental unit.
There is no task list & its operation.
Where am I going wrong?
Dear Pradeep,
I have created Measuring points for Equipment and assigned a Maintenance Plan with Equip. task list, when I try to assign Measuring Point as a PRT it saying Measurement Point not used.
Could you guide me how to assign Measuring point as a PRT in Equip task list? I have activated Inspection plan Ehp 4.
Regards,
Rajesh
Pradeep,
These are typical inspection rounds done at the plant. This functionality is provided in ECC 6.0 with EHP4, where in you can associate a Measurement point, as a PRT, to a operation on the order or task list(And Hence the MP). Then when you confirm the operation using the overall completion confirmation process then this specific measurement point will only be provided for capture of measurement reading.
If you are in lower version you will have to develop some custom process over the confirmation transaction to enter only the measurement document associated to the operation linked to the MP.The other way to do this is to enhance the Maintenance item to associate it to a Measurement Point or a Measurement List and then to pull up the same list(Or Point) from the Notification Object and capture the same.
Regards
Narasimhan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I have been able to see measuring point in a task list since upgraded to EhP4.
I was just trying to assign measuring point to operation But it is throwing error message saying measuring point doesnot exist.
When I press F4 none of the measuring point is existing though I have created Measuring point to equipment?
Can someone help me or guide where am I going wrong?
I have gone through the below link for details on inspection rounds but there is no elaborative & detailed procesure existing
http://help.sap.com/erp2005_ehp_04_sp/helpdata/en/48/689d3dd2613c87e10000000a42189c/frameset.htm
Could you pls tell me the detailled procedure or provide the material?
Regards
Pradeep
Dear Pradeep,
I am using ECC6 EHP4.
I am having the same requirement and for this i created a equipment with PRT type and created measuring points for it.
While i am trying to assign some measuring points to a equipment task list, i am getting option to assign Material/Eqipment/Document and other as shown below.
But i wast to assign measuring point here. Can you please tell me whether any settings to be done for this.
Regards,
Kalyan Varma
Hi,
After creating measuring points, assign measuring points to the task list operation as PRT.
While confirming order created from this tasklist, only measuring points assigned to the operation will be available for posting measuring documents.
check this. However this provision comes only if Inspection round functionality is activated in your system.
thks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
can you explain I will update measuring point but it is displaying all the measuring point of an equipment.
where the measuring point is displayed for the equipment
regards
thyagarajan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
94 | |
11 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.