Mass deletion of unplanned requirements

Former Member
0 Kudos

Dear guru's

I hope you can help me with my questions below:

First, Is is possible to mass delete unplanned requirements (stemming from forecast tab in material master) in SAP, as these are not managed through MD61-63 and MD74-75?

Second, do you have any idea of how to identify those products where unplanned requirements exist?

Thanks in advance!

Best regards,

Anders Thinggaard

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

The consumption based forecast contained within the material master forecasting options is something that can be alternatively used in MRP Planning. This is determined by the settings within the MRP Type. Note that you have options within the MRP Type to specify:

u2022 Is the forecast not done, required, or optional?

u2022 Should the forecast be based on unplanned or total consumption?

u2022 Should the forecast be used in MRP planning? If so, as a total or just unplanned?

Note that this last option makes the MRP planning be forecast based only.

In your situation, you can hide the forecast which is there (and can serve other purposes for materials planning) through the MRP Type settings.