cancel
Showing results for 
Search instead for 
Did you mean: 

Batch genration of production order componet take more time

Former Member
0 Kudos

Hi MM expert,

Batch determination of production order component take more time near about 25 to 30 minute, i don't know how,kindly suggest me what do to do to take less time for generating batch determination

regards

Aqueel

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

resolve

JL23
Active Contributor
0 Kudos

unfortunatly SAP reads first all batches of your material from table MCHB, then it checks the selection criteria of each batch, and finally it sorts the batches.

So the best way to speed the batch determination up is to delete the storage location segments with zero stock of a batch record (records of MCHB table), the batch itself will still be available in SAP (table MCHA and MCH1).

for this execute report ZREOMCHB which is attached to OSS note 62272 Poor response times during ATP-Check with batches