MRP Run for MRP controller

Dear Gurus ,

I implimented user exit for MRP run for particular MRP controller. Now suppose i have two FERT A & B which are belongs to MRP controller 001 & 002 resp. and C is depedent component for both A & B maintained in BOM . In C 's material master 001 is assigned as MRP controller . so at the time of MRP run for mrp controller 002 depedent requirement for C is not generated , is it not possible to generate depedent requiremtent in both cases i.e when we run mrp for 001 and 002 controller.

please guide me . Thanx in advance.

regards

siva