Test certificate receipt during UD for manually created lot

DearAll,

1:

Manually I have created the lot.

But I need confirmation of test certificate receipt during UD. System is not asking the same.

In material master I have assigned certificate type. This setting is working fine when lot is created automatically during GRN.

2:

System is not calculating the sample size while creating inspection lot manually.

I have also created the inspection plan. I have mentioned the sample size for each MIC. The inspection plan is getting attached to the lot. It is working fine for inspection lots created automatically.