cancel
Showing results for 
Search instead for 
Did you mean: 

Change of bin not possible during TO confirmation

Former Member
0 Kudos

Hi all.

I am trying to change the destination storage bin during transfer between bins (WM movement 309).

The strategy is fix bin (maintained in material master), so the TO is created with fix destination bin and operator must change it before confirmation.

For example, in GR it is possible to change destination bin during confirmation in transaction LT12 but not for transfer. The receiving storage type is the same in both cases. Is there any customizing missing?

Apart from this, is there any way to confirm items separately inside a TO? For example, during GR I try to confirm a TO in transaction LT11 for just one item and waiting for the rest to be placed physically in order to confirm all the TO but destination bin can not be modified in LT11. Is there any way to confirm item per item but allowing changing destination bin? it is possible to do it in LT12 but not in LT11.

Many thanks in advanced and best regards.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

hi,

in general changing of bin is possible in TO creation not in TO confirmation.

regards

muthuraman.d

Former Member
0 Kudos

Sorry, I have to disagree.

For GR my flow tested is next:

1. MIGO for PO

2. Creation of TO with source storage type 902/ source bin=PO number=> destination storage type XXX/ destination storage bin YYY, proposed by the system based on storage type strategy. This TO is created without confirmation.

3. TO confirmation in LT12 changing the destination bin before saving

Please, check this post where it is confirmed this way of working:

This is possible because it is allowed to change destinaiton bin during confirmation because it is defined so the storage type.

This is working for GR but not for transfers between bins and I don´t know why.

Any suggestion?

former_member536836
Active Contributor
0 Kudos

The change of bin is possible when you are confirming TO through RF.This configuration is done in storage type.

Regards,

Prashant

i037475
Advisor
Advisor
0 Kudos

Hi,

Generally, it is possible to change the destination bin during TO confirmation. However, this is not possible under the following conditions:

o With dynamic coordinates

o If the destination bin location is specified in the movement type

o For posting change transfer orders

o For the physical inventory using a putaway

o For the addition to existing stock for storage units

o For the transaction Confirm Single Item (transaction LT11)

o If a bulk storage type is involved in the stock movement

o In the event of an individual putaway strategy

o If the first item of a TO with storage units is already confirmed

since all the other items of the storage unit relate to the same

storage bin. When you save the first TO item, the system changes

the destination storage bin for all dependent items.

o If this is a replenishment transfer requirement for a fixed

storage bin.

Please see SAP Note number 443916 for an explanation.

Thank you.

Patrick

Answers (1)

Answers (1)

Former Member
0 Kudos

Many thanks all for your great help!!!