Customer Inspection Lock for final Confirma

Former Member
0 Kudos

Dear Sir

We have requirement in our business,we use inspection type 04 for all inprocess and finished goods material and we use control key QM01 for inspection plan.Inprocess stage has 3 operation with control key pp01,pp01 and pp03 and after confirmation of pp03 we receive a lot in quality (QA32) with inspection lot origin 04,we require as soon as second operation is confirmed we received a lot in quaity and it has lock or approval then only last operation to be confirmed.I know that 03 will help but it does not block to confirm for last operation.

please guide

Regards

kunal Joshi

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hello Kunal,

What I have understood is,

You need to fire a lot at confirmation of Operation : 02 then put the control key PP03 at operation :02 it will perform auto GR at confirmation of this operation and post quantity at QI and give you Inspection lot.

And the operation three have to confirmed same as the operation 01 is done with control key pp01. As more than one auto GR are not permitted.

Then you need to introduce the user exit to put the required control about the UD of 04 lot and confirmation of operation 03.

The user exits will be needing are,

For Process Order Scenario:-

CONFPI03 to carry out your own inspections (after choosing the phase to be confirmed)

CONFPI05 to update your own data after saving the confirmation

CONFPI06 to transfer customer-specific data to automatically generated confirmations

For Production Order Scenario

CONFPP05 PP order confirmation.: Customer enhancements during saving

CONFPP04 PP order confirmation: Customer-specific input checks 2

CONFPP03 PP order confirmation: Customer-specific checks after operation selection

Regards,

Shyamal

Answers (1)

Answers (1)

Former Member
0 Kudos

check user exit in confirmation of production order.Also explore OPK4