Hello all,
Trying to integrate PM and QM and so far it's been going well, but now i'm trying to transfer the inspection results to the measurement point of an equipment and that's where it goes wrong:
The inspection lot is entered. UD is made...but no transfer.
What's done so far.
customizing
Order linked to inspection type 14
Selected set created for UD with follow up action using the function module: QFOA_QM_CHAR_TO_PM_E_POINTS
Masterdata
QS21: MIC is created with link to characteristic XXX with values 0.10 - 10.00 bar
Equipment (type M) is created with measurement point using the same characteristic XXX
Equipment tasklist created with MIC and inspection point 300
that's about it. i think something is wrong with my measurement point or MIC, but'i can not find out what so far.
Can anyone help me out?
Peter
closed
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
10 | |
6 | |
5 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.