on 03-23-2010 5:51 AM
Dear experts
Can anybody tell me how to set up a time that material need to be inspect periodly? For example, inspect once per 3 months.
Please list the all neccesary steps. Thanks.
BRs
Steve
Dear Steve,
This scenario can be well mapped in SAP QM using Recurring Inspection process, basic prerequisite for this is " material should have batch management".
Following are the steps you need to do :
1) Activate '09' Inspection type (Recurring insp. of batches) at material master QM view (MM02)
2) Define Insp interval of 90 days in material master QM view (MM02)
3) Make quality plan for that material using usage (9) (QP01)
4) For auto generation on lot after every 3 months you have to do ' Job Planning ' using T code QA05. Here here you have to define varient, assign the material plant and click on 'To insp. stock at lot creation' . Here you also have to schedule the job giving time frame.
You can test this keeping Insp Interval 1 day, as per your schedule given the system will automatically generate the inspection lot and the stock will be posted to quality. You can see this in QA32 using 09 insp type.
Please feel free to write in this regard, this works 100% fine if everything is done correctly.
Best Regards,
Shekhar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi ,
This is recurring inspection .
IN material master QM view inspection interval -90 Days ( lot will get generated every 90 days till material is available in system.)
active inspection type -09
Inspection plan with usage -9
Above you require in material master.
QA07
create varient where you can create on material level.plant ., or batch level
If you put only plant that can be applicable for whatever material in that perticular plant.
their are option for cretaing inspection lots-you can select as per your requirement.
Then their option available you want to block the batch
also you can put how many days before you want create lot if you keep 7 Days then suppose inspection interval date is today lot then lot will get generated 7 days before.
Please check whether your requirement is same or any different. As per my view it will fulfill your requirement.
Regards
SANIL
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You can use recurring inspection.Activate insection type 09 in material master.Maintain inspection interval in material master as 3 months.Create inspection plan.If required same inspection plan can also be used.For that in config, make the change the usage in insp type 09 details.
Vishal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.