Kindly clarify below doubts

1. At the time of plant replication from the backend system to the SRM system as a Location, whether system replicates factory calender details also which is assigned to the plant in the backend system? If not how system proposing delivery date at the time of creating PO in the SRM system?

2. How table BUT100 : BP roles updation goind pn at the time BP replication?

Where is the roles mapping in the SRM system with the roles which are in the backend system?

Kindly explian

Thanks & Regards

KRK

Accepted Solutions (1)

Accepted Solutions (1)

former_member183819
Active Contributor
0 Kudos

Former Member
0 Kudos

Hi ,

Thanks for your replay

So, by using SCAL transcation we can maintain factory calender in the SRM system.

Is it possible to replicate factory calender from the backend SAP R3 system to the SRM system? If yes, How?

Where is the linkup between plant and factory calender?