INPROCESS INSPECTION LOT CHANGE SPECIFICATION

lakshmi_prasad7
Contributor
0 Kudos

can any body give to me solution after inprocess inspection lot i want to change specification is there any provision in sap standard like 01 and 04 inspection type we are change specification in change inspection lot

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

You can add specification in Recipe or routing as per your requirement & then can do read master data for your order.

Regards

SANIL

Answers (2)

Answers (2)

lakshmi_prasad7
Contributor
0 Kudos

it is not resolved

Former Member
0 Kudos

hi

If results are not recorded and operation are not confirmed then do the following

1. goto change routing / recipe -- change the specification

2. go to prod/process order --read PP master data

then do RR new spec. get reflected during result recording

regards