cancel
Showing results for 
Search instead for 
Did you mean: 

ud for 03 insp type

Former Member
0 Kudos

Pls advise do we need to do the ud for 03 insp type, incase all the qty of prod order is not ok (say, order qty is 2, 1 is accepted and 1 is rejected).

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,,

In process inspection type 03 Ud can be possible but any stock posting or any movement not possible .

What ever posting you have to do during GRN only.

Regards

SANIL

Answers (3)

Answers (3)

Former Member
0 Kudos

UD IS POSSIBLE BUT STOCK POSTING PARTIALLY NOT

former_member42743
Active Contributor
0 Kudos

Most places run a batch job to do the UD on their 03 lots.

Use QA40 to run manually and to create your variants.

Use QA41 to schedule it.

you can run this once a day or every hour. What ever makes sense for you.

FF

Former Member
0 Kudos

Dear Yadav,

Very much possible, in QA32 when you take UD Give 2 as accepted qty & 1 as rejected qty

for rejected qty mainatin seperate storage location

Regards

Madhu