on 03-17-2010 2:41 PM
Dear Optimizer Experts,
The scenario is like as follow -
Material X extended to location A & B, in optimizer we dont want X to be planned at A, therefore we have excluded location A from optimizer variant. But location B exist in variant because we want the planning at locaion B.
Now the optimizer is throwing error "Material master not created" & message no. /sapapo/snp042
For your information we have set the SDP relevance indicator to 1 for the location A.
Please share your valuable feedback.
Thanks
Sumit Kalyan
thanks to all
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sumit,
"Material X extended to location A & B,.." How you did this in R/3 or created manually in APO (for testing)?.. I hope if you reciffed your material after extending in R/3. Check your product location is assigned to the active model.
Thanks,
Satyajit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Even I am confused.. I never said that you cant extend the meterial to different locations. I am saying If you have done this in R/3 then the changed think should be reflected in APO. Thats fine you dont need to assign it to a model. But if you created this in APO then dont forget to assign it to the model. Check your material is assigned to a active model for that concerned location.
Thanks,
Satyajit
Hi Sumit,
Assuming that you are using a Cost Based Optimizer, there are number of ways to exclude Material A from picking up by the Optimizer, you can use anyone you feel is fit to meet your requirment.
1) Define a Very high Non delivery Penalty for Location B and zero Penalty for Location A
2) Block the transportation Lane for that Materials from Location A
3) Mark the Material at Location A as " Flag for deletion" this is to be done in ECC and then CIFed to APO
Try any of these options it should work.
Thanks,
Harsh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sumit,
Assuming that you are using a Cost Based Optimizer, there are number of ways to exclude Material A from picking up by the Optimizer, you can use anyone you feel is fit to meet your requirment.
1) Define a Very high Non delivery Penalty for Location B and zero Penalty for Location A
2) Block the transportation Lane for that Materials from Location A
3) Mark the Material at Location A as " Flag for deletion" this is to be done in ECC and then CIFed to APO
Try any of these options it should work.
Thanks,
Harsh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.