cancel
Showing results for 
Search instead for 
Did you mean: 

how to avoid scedule of running scenario

Former Member
0 Kudos

Hi All,

I am new to XI, in our company, one perticular job is running and posting the file in the one perticulat location for evry minute and total space is occupied by these files. I don't know who is sceduled this job.How to avoid this i.e running the job and placing in location for evrery 1 min. Please give your valuable inputs. Thanks in advance.

regards

Vishal

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hello Vishal,

I assume the following things :

Job is processed through XI , and written to a file in a directory right ?

Assuming so , you can always check the systems SXMB_moni what is the xml file thats frequently being executed.

Secondly , u could see the same things using the MDT tool in rwb.

in both the cases , you are checking based on xml files processed.

Please let me know if my assumptions were wrong ?

Vara

[PLEASE REWARD FOR POSTING]

Former Member
0 Kudos

Hi Vara,

A big thanks for your reply.

Yes, Job is processed through XI , and written to a file in a directory.

So how to avoid writtening to directrory no more. How to control this. thanks.

regards

Vishal

Former Member
0 Kudos

Now as u check in sxmb_moni u will find which is xml thats frequently generated at the rate of what u r thinking.

In that you will find the sender and receiver , service details etc.

go to Int. directory for these entries and check corresponding file adapter and make necessary changes.

[PLEASE REWARD FOR POSTING]

Answers (0)