Would need some help in determining how to proceed with splitting delivery based on Schedule line data (Date/Time).

If S.A 1 has line item 10 with two schedule lines SL1 and SL2 which happened in different times of the day, how to split this S.A to two deliveries in delivery creation (thru VL10E).

Please suggest.

Thanks,

Preema

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

In the copy control SA to delivery, you can maintain the required split criteria.

Take help of ABAPer and explain the date/time logic.

thanks

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

In copy control see which Split routine is there, with the help of abaper

Copy that and create new one, an maintain your date criteria in newely created routine and assign that.

T-code VOFM

Kapil

Former Member
0 Kudos

hi,

routine doesnt help much as its not a header data - its S.A item and one S.A item can have multiple schedule lines with same date/different time

Thanks,