cancel
Showing results for 
Search instead for 
Did you mean: 

Unable to change Product Cost Collector controlling level for a material

Former Member
0 Kudos

Hi,

When we create a Product Cost Collector (PCC) for a material for the first time, we can choose at which controlling level this PCC is created (Production version or BOM/routing or Production Plant/Planning Plant).

However when we delete this PCC and try to create a new PCC for the same material, we have no option for choosing the controlling level. The choice options are grey and the new PCC can only be created at the same controlling level as the previously deleted PCC.

We use transaction KKF6N.

Could anybody advice us, how to change the controlling level for a material?

Best regards,

Marcin

Edited by: Marcin Kaiser on Mar 9, 2010 1:13 PM

Accepted Solutions (1)

Accepted Solutions (1)

takashi_kotani
Active Participant
0 Kudos

Hi Marcin,

Please try to change the Controlling level in transaction CKMLMV_CA for anothers and then, to create a new product

cost collector for this material and plant in transaction KKF6N. You cannot change the Controlling level if there are procurement

alternatives or procurement processes for that Controlling level that are already being used (You said delete PCC). If you want to change the Controlling level, note the restrictions in the following cases:

1)A product cost collector already exists for the Controlling level. In this case, you can only change the Controlling level after the product cost collector in question has been deleted.

2)Production processes that are assigned to a cost object hierarchy already exist for the Controlling level. In this case, you can only change the Controlling level if the production process has been removed from the cost object hierarchy.

3)Procurement alternatives that are used in a mixing strategy already exist for the Controlling level. In this case you can only change the Controlling level if you remove the procurement alternatives for the strategies displayed.

Best regards, Takashi

Former Member
0 Kudos

Hi Takashi,

thank you for your reply. It was very helpful and solved the problem!

Best regards,

Marcin

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi Marcin

  I have the same issue and tried in CKMLMV_CA but it is showing lock..how I can change it to unlock

Can you provide some light?

Kamal

Former Member
0 Kudos
Hi Kamal,
Follow below Steps to change controlling level from production version to BOM/Routing.
Steps:
1.Delete PCC
Go to KKF6N, Click on edit on menu , set deletion indicator
2.Create BOM  and Routing for FG Material
3.Delete production version in material master T code :MM02

4.Follow below step by step in t code: KOAR
Press Preparation
- Enter variant name, press button variant
- Enter PCC, controlling area, flag the field deletion indicator and remove flag test run
- Save attributes, enter name in description field
- Save again
- Press start date, press immediate, Save
- Enter Spool parameters
- Press execute
5. Edit the controlling level of material through t code CKMLMV_CA from Production version to BOM/routing for the material
  Enter the plant and the material.
  The padlock symbol next to the relevant Controlling level is not locked.
Position the cursor on the Controlling level (production version)that you want to change, and double-click on the symbol Change Controlling level.
Choose a Controlling level(BOM/Routing) from the selection window.
Thanks,
Ram

Answers (0)