We have MM-SUS scenario on SRM 5.0, PI 7.0 and R/34.7c. Now we are upgrading ERP to ECC 6.0. The old backend system name is D07CLNT100 and the new name is D08CLNT100.

Can anyone let me know what are the steps need to be carried out in SRM for synchronising with the new backend system. Complete system details are chenged for ERP (IP, System ID etc.).

Regards,

Ashish

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hello,

I presume you are asking of the chnages that needs to be done in the SUS system.

You need to check and change the following:

1. Partner Profiles.. WE20

2. CheckPort for XI..

3.In XI create a comm channel for the new system and copy th e config scenario, generate and save

4.In the SUS build the pposa_bbp as the buyer data ( regenerate the creation of the Co code as Partner) will have chnaged

5. Maintain the attributes related to the new Logical system in the Org structure

6. Replicate the Vendors

7.Maintain the Tax settings thro Tx OBCA etc in the Backend system

Regards,