Hello,
I am running QA16 in background job for SKIPPED lots.
But sytem is not doing the UD for inspection lots.
Inspection type is 01 and program used is RQEVAI10.
When the same is done online we are able to do UD.
Can you please give me the condition under which system will do UD in background for QA16 transaction.
Please share your inputs.
Regards,
Amit
Dear Amit,
These are the pre requisites for successful Auto UD. Are all of them are meeting???
No characteristic has been rejected in the inspection lot
All required characteristics have been confirmed and closed
No defect records exist for the inspection lot
An automatic usage decision has been planned for the material
Regards,
Shyamal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Shyamal,
Thanks for your reply,
What I require that I want to do the UD for skipped lots in QA16 transaction in background JOB.
I am scheduling the backgroung job for program RQEVAI10 (used in QA16).
Here system is not making the UD for skipped lots when I am cheking these lots after job has been executed.
Please let me that is program RQEVAI10 can be runned in background run to take the UD of skipped lots or
I have to schedule in QA17 for skipped lots?
Please give your suggestions.
Regards,
Amit.
Let make sure you understand what a skip lot is.
When running QA16 for skipped lots, it will only process inspection lots that have the system status of "SKIP" on them.
Is this the case for the lots you are trying to run?
Other than that, the only requirement for skip lots is that the Automatic UD indicator in the material master is clicked on for the inspection type. And of course that the lots you are trying to process fall within the parameters of the QA16 job, (i.e date range, plant, etc.).
FF
Dear Amit,
Apart from this stuff, just try following also if works.
SPRO>Quality Management>Basic setting>Maintain settings at plant level>Select plant where you want to schedule auto UD>Go to inspection lot completion tab>check here delay time for skip lot.
Whether before reaching this time you are scheduling this auto UD? Even though all the prerequisites quoted by Shyamal have been fulfilled system does not give auto UD if this timelines are not met.
Best Regards,
Anand Rao