Can we do EASY COST PLANNING at Network Activity Level

Former Member
0 Kudos

Hi Gurus,

Can we do easy cost planning at NWA level if so what need to be configured in the system. Please provide step by step instructions.

Can any body explain in detail about easy cost planning in SAP PS and the configuration steps involved.

Thank You,

Kaka

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Kaka,

We can do ECP for network activities and even activity element also....but for that your Project system should have the enhancement package 3 (EHP3)...Please check that before you try that...

Wtith the help of tcode CJ9ECP....you can do ECP for network...

For more details about EHP3...please click on the below link..

Appreciate if it useful to you...

Regards

Vetri

Edited by: Virendra Pal on Mar 5, 2010 8:23 AM

Link removed

Former Member
0 Kudos

This message was moderated.

Former Member
0 Kudos

Hi Vetri,

Can you tell me how to plan cost at NWA level using ECP in CJ9ECP.

former_member203108
Active Contributor
0 Kudos

ECP for NWA is possible as of EHP3

Former Member
0 Kudos

How to check whether EHP3 is there or not in the system.

If it is there what should I need do next.. Does it need any configuration for easy cost planning...

former_member203108
Active Contributor
0 Kudos

Check with your Basis person.

Yes you need to activate ECP for NWA, if you are in EHP3. You can refer this

Edited by: Virendra Pal on Mar 5, 2010 8:26 AM

Link removed

Former Member
0 Kudos

Thank you for quick response.

I activated ECP for NWA but how can I plan cost at NWA.

If I got CJ20N what should I do to plan cost on NWA using ECP.