hi,

i am woring on a recurring inspection of a mataerial , for that i did the following setting

1) Activate in material master inspection type 09 and in put the inspection interval 01 days ,

2) and i sheduled in QA05

3) inspection plan is maintained

still i didnot get the inspection lot after the interval

Please suggest

Accepted Solutions (0)

Answers (4)

Answers (4)

former_member186399
Active Contributor
0 Kudos

Dear Maashish

Please let me know the following

1) Have you maintained this material as batch managed

2) How was the batch created

3) Is the next inspection date maintained in MSC2N for this batch

Regards

Gajesh

Former Member
0 Kudos

hi Gajesh,

1) material is batch managed.

2) Batch is maintained through MSC1N.

3) Next inspection date maintained in MSC2N for this batch

Please suggest

MS

former_member42743
Active Contributor
0 Kudos

Have you double checked that the "active" indicator for the 09 inspection type is clicked on the material master?

Are you sure the next inspection date is falling within the window your specifing in QA07?

FF

Former Member
0 Kudos

Dear Maashish,

I have used this function many times and used it successfully pl check if you have done following steps:

1) Define Inspection Interval in QM material master view.

2) In QM material master view , inspection setup activate 09 inspection type (tick on active)

3) Make quality plan for that material using '09' usage.

4) In QA05 , define a varient

5) select that defined varient and put that material, plant and batch. please tick on " to inspection lot creation" (in maintain varient screen). If you don't do this lot will not be generated.

6) select the varient and then press schedule tab.

7) click on scedule one / periofically and select the desired frequency.

😎 as per defined frequency system will that program and lot will be generated auromatically. If you want to generate lot immediatly.

9) check the effect of this on that batch, in MSC2N system will display next inspection interval based on data you maintained.

10) In QA32 put material, batch and 09 type, the lot will be displayed.

Note : step no 5 is very important.

Best Regards,

Shekhar

Former Member
0 Kudos

Hi,

As you told in MM you have done 09 Insp Active and 01 as inspection Interval.

What you are making in QA05 scheduling. What is period you have taken, If you want to have inspection lot daily than schedule that variant for less that one day frequency.

Regards,

Neeraj

Former Member
0 Kudos

hi,

Its already done , my concern is that inspection lot is not generated in QA32

please suggest

Maashish

Former Member
0 Kudos

Hi,

Let me know are able to create lot manually by QA07 or manually....

Let me know your QA05 settings..

Neeraj

former_member494495
Active Contributor
0 Kudos

HI

Check the following

1. Checked batch in MM

2. Insp interval in MM

3. Insp Lot origin 09 in MM

4. Check indicator Task list or Mat spec in MM in QM view

5. Next inspection date in batch maintained

Regards,

M.Alagesan

Former Member
0 Kudos

hi Neeraj,

Please update your profile so that i send u a mail with screen shots

regards

maashish

former_member42743
Active Contributor
0 Kudos

Did you check that the batch record has a "Next inspection Date" value defined?

Craig

Former Member
0 Kudos

Hi,

check in QA05 have you click on shedule & start immidiately.

If you have done it then their may be reason that you have schedule it today & your inspection interval is 1 day their fore you will get lot tomorrow .

If you want lot today then you should have kept in varient QA05 run in days 1 in that case lot will always get created 1 day before.

Just check it.

regards

SANIL

Former Member
0 Kudos

hi,

In QA05 i sheduled and start immediatlely and when i click on display shedule it show released and cancelled as per planning , but in qa32 inspection lot is not generated

Please suggest further

Regards

Maashish