on 03-03-2010 12:10 PM
Hi,
Can any one explain me the steps involved during Goods issue to Production order (Inspection Type 02) and In process Inspection (Inspection type 03).
Regards,
M25111979.
Hi,
Scenario: You need to do In-process inspection and GR Inspection for Production Order
Master data needed : Material Master,BOM, W/C, Routing
2 Master Insp. Characteristics u2013 for 03 and 04 Insp. types
Inspection Plan for 04 Inspection Type
Steps :
1. MM01 : Create Finished Material
In QM View in Material Master :
Click Insp. setup
Assign insp. Type 03 u2013 In-process inspection for Production order
And 04 - GR Insp. for order, by selecting new insp. Types.
Ensure both as active plans, by ticking the active indicator.
2. Create BOM, W/Cs
3. Goto QS21 , create Master Inspection characteristic for In-process inspection (03)
Give Status as Released and Complete copy model for MIC
Select Quantitative characteristics and tick the relevant indicators i.e., in this case Lower specific limit, Upper specific limit and Check Target value.
Press Enter
Itu2019ll prompt you for entering lower, upper and target values for the MIC ,
Enter the values.
SAVE
Similarly create another MIC with tcode QS21, for GR Inspection for Order (04)
4. GOTO CA01 u2013 Create Routing with status u2013 Released (4) and Usage u2013 Production (1)
- Click operations, Create Operation and give the control key as PP06
- Select the inspection operation and click on the insp. Characteristics, assign the MIC you`ve created for GR Inspection type(04) and press enter. All the characteristics will be copied.
SAVE
5. GOTO QP01 u2013 Create Inspection Plan with status u2013 Released (4) and Usage u2013 Production (1)
- Click operations, Create Insp. Operation and give the control key as QM01
- Select the inspection operation and click on the insp. Characteristics, assign the MIC you`ve created for GR Inspection type(04) and press enter. All the characteristics will be copied.
SAVE
6. GOTO CO01 u2013 Create Production Order Manually
(Or create from PIR, SO etc.., )
7. Release Production Order
Insp. Lot gets generated for In-process Inspection
8. GOTO QA32 u2013 Inspection lot selection
Give Material and Plant Execute
Select your inspection lot line, and select result recording.
{Incase, if it is not allowed to record results, GOTO QE02, give insp. Lot No. and select Change Insp. Lot Icon, give the relevant task list usage and press TASK LIST button in the Inspection specification Tab and then SAVE, Itu2019ll come to release status , and proceed with these steps}
Give inspected quantity and target value that is checked
SAVE
You can find in QA32, that the status is changed to INSPECTED
Now again select the insp. Lot in QA32 and goto Usage decision,
Give UD as A u2013 for accept
SAVE
REFRESH
9. GOTO MIGO u2013 GR for Production order (Not needed if you set the indicator AUTOGR)
Check in where tab : give storage location
Ensure item ok indicator is ticked
Post (SAVE)
Now the inspection lot gets generated as you post the goods for GR Inspection for Production order.
10. GOTO MMBE u2013 You can observe that the stock is posted to Insp. Stock automatically
11. GOTO QA32 u2013 Inspection lot selection
Give Material and Plant , Execute
Select your inspection lot line, and select result recording.
{Incase, if it is not allowed to record results, GOTO QE02, give insp. Lot and select Change Insp. Lot Icon, give the relevant task list usage in the Inspection specification Tab and press TASK LIST button and then SAVE}
Give inspected quantity and target value that is checked
SAVE
You can find in QA32, that the status is changed to INSPECTED
Now again select the insp. Lot in QA32 and goto Usage decision,
Give UD as A u2013 for accept and Quantity to be moved to unrestricted use stock
SAVE
REFRESH
12. GOTO MMBE
Now you can observe that the stock is posted to Unrestricted use.
Similarly, you can exercise on Repetitive manufacturing, but there the inspection types will be 13 u2013 In-process inspection for run schedule header
04 u2013 GR inspection
Hope this scenario will helpful for you.
Appreciate if it is so....
Regards
Vetri
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
10 | |
10 | |
6 | |
5 | |
5 | |
5 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.