Material consumption in a MIC or IP
How can i plan my material consumption for QI i a specific MIC?
For example I want to add (and MRP-plan) a "quality-material" (ex. expensive sterile one-use-equipmet or chemical ) without link this material to the inspected material BOM.
Edited by: Andreas Larsson on Feb 26, 2010 11:23 AM