cancel
Showing results for 
Search instead for 
Did you mean: 

Refurbishment of batch materials with split valuation

former_member665343
Participant
0 Kudos

Dear Sir,

Kindly guide me how to carryout refurbishment of batch materials with split valuation.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

If you want to use refurbishment cycle with Batch Management activated , You need to use dynamic split valuation so that the system would create valuation type same as the batch number.

Regards,

Manoj

Former Member
0 Kudos

Hi,

Can you tell me where in SPRO that the dynamic split valuation is configured?

Former Member
0 Kudos

I dont think it is possible in SAP std. Either you used valuation batch or batch material. You cant combine both for the refurbishment process.

In std there is only one field to capture batch of the material either valuation type or Batch of the material.

Please have a look around for exit or development.

DP