on 02-26-2010 4:08 AM
Dear Sir,
Kindly guide me how to carryout refurbishment of batch materials with split valuation.
Hi,
If you want to use refurbishment cycle with Batch Management activated , You need to use dynamic split valuation so that the system would create valuation type same as the batch number.
Regards,
Manoj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I dont think it is possible in SAP std. Either you used valuation batch or batch material. You cant combine both for the refurbishment process.
In std there is only one field to capture batch of the material either valuation type or Batch of the material.
Please have a look around for exit or development.
DP
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
94 | |
11 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.