on 02-25-2010 2:00 PM
Recipe mgmt:
hi
i m trying to create a recipe with dep formula in RMWB and finding below errors in the system.
background :
1. created new recipe and entered basic data
2. entered process data in process tab having only ONE stage and operations
3. selected, stage- dependant formula to enter the inputs items (material, qty and UOM) in Input/output tab, followed by entering the output material.
now the system has to calculate the output quantity with base UOM or as per UOM mentioned.
QUESTION 1: but my system is not at all calculating ? and gives the field readonly mode.
QUESTION 2: also, suppose, if i have two stages and enter the intermediate created through "create stream" button, i m not able to use it in stage 2 as input, as the button still shows "create stream", rather than "create/ use stream"
Thanking you for your early positive response.
Thiag
solved
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
solved
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
QUESTION 1: is solved:
For calculation to happen: following config to be maintained
in PP-PI : Master data - recipe mgmt - formula - define and assign values to environmental parameters
in that maintain
FRML_DEF_UNIT_FLOAT_STORE entry with default value as KG or LB..
which is a must...
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.