on 02-24-2010 7:53 PM
Hi everyone,
I have a pair of doubt. We are planning to upgrade SRM 3.0 to SRM 7.0 with ECC 6.0 ep 4 in a classic scenario. My doubts are:
1.- Can we create a PR from a SC using PI by standard or is the same as the previous version (using RFC)??
2.- Can we create a PO from a SC using PI by standard or is the same as the previous version (using RFC)??
3.- We checked the documentation and there is a different type of contract, the central contract. This contract can be transfer to ECC?? if yes, is it transferred using PI??
Thanks,
Ivá
1.- Can we create a PR from a SC using PI by standard or is the same as the previous version (using RFC)??
2.- Can we create a PO from a SC using PI by standard or is the same as the previous version (using RFC)??
PI is not mandatory in SRM 7.0. Data transfer via RFC is fine.
3.- We checked the documentation and there is a different type of contract, the central contract. This contract can be transfer to ECC?? if yes, is it transferred using PI??
Yes and Yes. With central contract, ECC 6 EP 4 is required.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Jay and Muthuraman.
BR
Ivá
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.