Owner Allocation

Former Member
0 Kudos

Hi ,

I have maintained the owner allocation as : Owner allocation with automatic move-in (in configurartion).

The below values has been maintained in the config:

Earliest start date : 5 days

latest start date : 10 days

Then i have created an property with the 01/01/2010.

I have assigned an installation and maintained validy period as 02/01 to 05/31.I have checked the create event in the tranacstion.

I have performed the moved out for the X installation on 10/01/2010.

as per the system calculation :

Move-out date

10/01/2010

upper limit

15/01/2010

lower limit

22/01/2010

move-in date

01/02/2010

The move-in should happen automatic on 01.02/2010.But the work flow is not triggering.The automatic move-in is not triggering.

Can any one suggest the solution.

Thanks in advance.

-Santhosh

1 REPLY 1

Former Member
0 Kudos

This is not resolved