cancel
Showing results for 
Search instead for 
Did you mean: 

Goods Receipt in the Current Date however Goods Issue in the previous date.

Former Member
0 Kudos

Dear Experts,

I am doing a GR through MB1C (Movement Type 561) in the Current Date (Both Posting and Document Date are current) for a Particular batch of Material. However when I am trying to create a sales order->Delivery and PGI in the past date the system is allowing me to do so. What could be the issue ?

Example : On 23-02-2010 Goods Receipt of Material "A" for 50 Tons for Batch "B100" done through MB1C Movement Type 561.

Stock in System as on Date 23-02-2010 in MMBE is showing 50 Tons of Material "A", Batch "B100".

A Sales Order is created for 22-02-2010 for the same Matrial, qty, batch and PGI is done on 22-02-2010.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

Issue is that previous period is not closed that is why system allow to create delivery in back date.

Kapil

Former Member
0 Kudos

I am entering the GI date in current Period only, just one day before Goods Receipt date.