on 02-23-2010 10:36 AM
Dear Experts,
I am doing a GR through MB1C (Movement Type 561) in the Current Date (Both Posting and Document Date are current) for a Particular batch of Material. However when I am trying to create a sales order->Delivery and PGI in the past date the system is allowing me to do so. What could be the issue ?
Example : On 23-02-2010 Goods Receipt of Material "A" for 50 Tons for Batch "B100" done through MB1C Movement Type 561.
Stock in System as on Date 23-02-2010 in MMBE is showing 50 Tons of Material "A", Batch "B100".
A Sales Order is created for 22-02-2010 for the same Matrial, qty, batch and PGI is done on 22-02-2010.
Hi,
Issue is that previous period is not closed that is why system allow to create delivery in back date.
Kapil
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.