I want to assign materials to activities in mass. Please suggest in which transaction i can assing.

Now we are going with CJ20n we have to open individual projects and WBS element and we have to go to all the activities indually and assinging the materials. so it is consuming lot of time.

Please provide the solution how to assign materials to actities in bulk.

Thanks

Regards

DON

Accepted Solutions (1)

Accepted Solutions (1)

virendra_pal
Active Contributor
0 Kudos

transaction CN33 or use standard networks with material

see SAP help and also check this forum